Martin® Total Transfer Point Solution Reduces Dust and Spillage
A silver and lead mine in Northern Mexico was experiencing excessive downtime on a main conveyor transporting raw ore. Spillage and dust emissions were pervasive in the loading and discharge zones, while access for maintenance and cleanup was difficult and unsafe.
Belt Sealing Products Reduce Cleanup and Maintenance Costs
Located on the Ohio River, the Mt. Vernon Transfer Terminal moves approximately 1.8 million tons of coal annually from trucks or railcars to barges for shipment to power plants. Excessive spillage from an underground belt below the railcar dumper increased cleanup costs and maintenance headaches. This conveyor is 84 inches wide with an operating speed of 150 fpm.
PSP 1328 - Transfer Point Solutions
One of the largest silver producers in North America was experiencing excessive dust and spillage on the conveyor leading from the crusher to the surge pile, which lowered air quality, required 5-10 man-hours per day to clean, and caused unscheduled downtime from premature equipment failure.